Saturday, March 9, 2013

March 9, 2013: Finishing, walls, painting, baths

The finishing work is probably the hardest.  Painting the inside revealed problems with the taping.  This sometimes required the tapers to return more than once to fix problems.  The worst areas were the 45 degree angles.  The next was the horizontal taping in the family room that was highlighted by the lights in the ceiling.  Ugh...

The guest bathroom shower is done. 

The entry hallway is painted.  The doors to the living room are painted and installed.  The floor is not yet had it's finishing.

The girls bathroom is nearly complete.  The vanity plumbing and doors, mirror and wall lights need to be installed.



The stairs are done.  The have cardboard taped down to protect them since the rest of the house is still being finished.
Another view of the finished stairs.


The master bath vanity is installed with its granite top.  Sinks and plumbing are next.