A break in the rain and in between softball practice and a soccer scrimmage for Cali. |
A strongwall in the front room. |
Demo starts on the stairs. This is from the old master bedroom. The wall that was on the right of the stairs has been removed. |
The upstairs have been cleaned out and demo starts. First the walls com off. This is looking from the old entrance towards the northwest corner. |
Cali is standing to the left of the old closet. Behind the closet is the bathroom. |
Cali at the bottom of the old stairs. The carpet has been removed. |
Looks like a completed strongwall. |
A completed main vertical support structure. |
The first engineered header is placed. |
No comments:
Post a Comment