The front entrance is taking shape. |
Also adding the roof plywood. |
The gable roof over Alex's room. |
Looking down the stairwell. The upper part is tricky and will need some special engineered wood. |
From the new master bath looking into the walk-in closet. |
The new master bath towards the shower. |
The master bed room. The window and door to the balcony are framed in. You'll see those from the outside as being cut out. |
Looking through the bathroom wall from the master bedroom. |
Down the main hall. The roof is not yet on. |
More roof work. |
Saturday morning visit after swim practice. This is in Alex's room. |
The front entrance has more. The gable roof is on. The arch is really taken shape and the window above the arch is drawn in. |
Same pic of the main hall as earlier, but now the roof plywood is on! |
The new master bedroom window and door are now cut out. |
Stairs from the laundry room. You can see the tricky upper landing that's going to require the engineered wood. |
More of the stairs... |
The entry arch from the front door. The window above the arch is drawn in. |