| The front entrance is taking shape. |
| Also adding the roof plywood. |
| The gable roof over Alex's room. |
| Looking down the stairwell. The upper part is tricky and will need some special engineered wood. |
| From the new master bath looking into the walk-in closet. |
| The new master bath towards the shower. |
| The master bed room. The window and door to the balcony are framed in. You'll see those from the outside as being cut out. |
| Looking through the bathroom wall from the master bedroom. |
| Down the main hall. The roof is not yet on. |
| More roof work. |
| Saturday morning visit after swim practice. This is in Alex's room. |
| The front entrance has more. The gable roof is on. The arch is really taken shape and the window above the arch is drawn in. |
| Same pic of the main hall as earlier, but now the roof plywood is on! |
| The new master bedroom window and door are now cut out. |
| Stairs from the laundry room. You can see the tricky upper landing that's going to require the engineered wood. |
| More of the stairs... |
| The entry arch from the front door. The window above the arch is drawn in. |
No comments:
Post a Comment