The front from the street (and behind the security fence). |
The gable eaves are being added. |
The eaves around the south side of the house. |
The kitchen ceiling. We're thinking we may leave the high slope instead of flat (at the level of the horizontal joist). |
The new rear patio. The right post is going to be moved 1/2 foot to the right. |
The 'great' room. The sofits are not yet in. |
Some of the first bits of plumbing. This is the main drain from the master bath. |
The water heater room from the laundry room. The diagonal thing is part of the contiguous 50% wall. |
The mud room ceiling. We need to figure out a solution for this. It's 8', not 8.5' as the rest of the kitchen. |
A pic of the detail of the main beam in the mud room. It's part of the issue for how to deal with the mud room ceiling. |
A pic of the front of the house from the other side. |