The eaves in the front use tongue-in-groove boards. |
The entrance has its eaves on too. |
To save money, the eaves around the rest of the house were changed to plywood. |
Plumbing for the half bath. |
Looks like a sewer clean-out opening to the outside. |
The laundry plumbing. |
The main drain... |
More main drain or stuff flowing too it. |
The new south facing roof. This is where the solar panels will be re-installed. We're looking at the possibility to increase the size. |
Matt and his crew. |
The north facing roof. Nothing but shingles go here. Well, the skylights go here (a bit off to the right). |
Yet another pic of the main room from the stairs area. The horizontal section will be removed. We've got enough wall to maintain contiguity. |
Minor main drains flowing into the main drain. |