During that time some progress was made on the house. Most of the windows were delivered and some were installed. More were installed this week. We also talked to Sandon the tile guy. I also chatted with Phil the HVAC guy (Bartlett).
OK. I'll start with a couple swim pics. This is from Sunday night at Farrells Ice Cream Parlor. This is the Zoo. Lot's of Ice Cream. Yum! |
On Monday morning a few of the girls went on a 5K open water swim. |
Back to house pics. This is Matt doing preparation work on the arched openings for the side windows. |
You can see how the window fits. It still needs to be flashed, so the other window will be coming back out. |
The two HVAC units are up there in the pipe mess. |
This is over the living room. The left and center go to the living room. The right for the panty/mud room. |
One of the intakes and intake pipes. |
A picture of the windows and one panel of the rear patio door. |
This is the supply for the second story. It rises up from a corner in the first floor laundry, the up through the master closet. |
The window and slider door are installed in the master. |
Another pic of the side windows. That's Matt again. |
The front facing windows on the second floor are installed. Very nice. |
No comments: