The stucco is complete. This is a sanded finish. This is uncolored. |
The hardwood floors installation has started. |
Beth and Matt conversing. |
The master bath now has doors. |
Master bath from the other direction. The doors and trim are being installed. The skylight works really well. |
The stair crew has started. There are poplar side pieces installed so far. |
The stairs from another angle. |
The back of the house with stucco completed. The balcony still needs some finishing and decking. |
The glass block windows for the master shower are completed. Looks good. This is from the balcony. |
The north side of the house (driveway). Things are getting cleaned up. |
We're finalizing the design of the fireplace surround. Granite and painted wood. We'll use this picture for working up the design. |
All the tiles and grouting is complete in the master shower. |
The front of the house from across the street. |
The large living room front window is getting its trim. |