PG&E marked the location of the utilities on the ground. The yellow is the path of the gas line. |
The yellow dashed line where the gas line runs under the front yard. The white square (and line?) is where the sewer cut-out needs to be dug. |
A closer view of the gas termination. |
The ceiling Beth's office is insulated. Cali is standing in the hallway next to the stairs. |
We added blocking in between studs in areas that we might be mounting art. This is the stairwell. |
This is the master bedroom. How did they get those sheets of wallboard up here? |
The family room loaded with wallboard ready for the post-christmas installation. |
This is the blocking for the TV wall mount. |
We added some blocking in front of the armor plating. |
Some blocking above the fireplace. We wrote down the centers (height from floor) on the plans that Cali is holding. |
This is the wall behind the fireplace. |
This is the wall behind the powder room. |
This is the wall between the two windows in the living room. |
This is the powder room. The blocking here is for the TP holder. I think all bathrooms got TP holder blocking. |
This is the wall opposite the patio doors in the family room. |
This is the wall to the right of the kitchen in the family room. I wanted to capture where the strapping and plates were located. |
No comments:
Post a Comment