| Francisco and his crew installed the cabinet in the guest bathroom. |
| This is the laundry room. The tiles have been installed but not grouted. The cabinet hardware is being staged. |
| The girls tub. Blue Pearl granite for the top and trim. Porcelanosa Carrera Blanco for the walls and floor. |
| Another shot of the tub from the other direction. |
| The drain that was punctured by a screw has been repaired. |
| Working out the placement of the kitchen island. |
| Francisco installing the laundry room cabinetry. |
No comments:
Post a Comment