February 2, 2013: Floor installed, cabinets starting

Nearly all the hardwood is installed.  There is a bit where the family room meets the kitchen.  The girls tub walls and possibly the floors are installed.  Looks like it still needs grouting.  The front got the window sills installed, but not properly.  There are problems with the slope direction and other issues that will require replacement of the sills from two windows.  This is being done on Thursday.


Francisco and his crew installed the cabinet in the guest bathroom.

This is the laundry room.  The tiles have been installed but not grouted.  The cabinet hardware is being staged.

The girls tub.  Blue Pearl granite for the top and trim.  Porcelanosa Carrera Blanco for the walls and floor.

Another shot of the tub from the other direction.

The drain that was punctured by a screw has been repaired.

Working out the placement of the kitchen island.

Francisco installing the laundry room cabinetry.