January 30, 2013: Priming the stucco and stair nearly complete

The painters started priming the stucco today.  The weather is excellent.
The stair crew have completed their work.  The landings are to be done by the hardwood floor crew.  The wood is not stained yet.  We're thinking of staining the stairs a bit darker than the floors.

The painters are priming the stucco.  They either use just rollers or spray followed by backrolling.
A demonstration of the roller only technique.

The north side (driveway) priming is complete.
Inside, the stair work is complete.  Ready for the flooring crew.


Another picture of the stairs from the family room.


The girls bathroom is being tiled.  The tub surround has it's granite top installed.  The Porcelanosa Carrera Blanco is being installed on the walls.
Jason is doing the work.  Nice job!

Beth is checking out the stairs and fretting over what to do for lighting in the stairwell.  The skylight is proving the light in this picture.