Saturday, January 26, 2013

January 26, 2013: Stair and floor progress

The stair crew and flooring crews have been working hard.  The wallboard is completed (I believe) and ready for priming.  We're finalizing the wall colors.  Since it's just paint it's not a critical as some other decisions.

The living room fireplace will have a granite hearth flush with the floor.  The floor crew framing it.

The stair crew have added the steps for the stairs.

Back to the living room.  This shows how the hardwood floor is installed.

This is the stack of hardwood flooring material for the house.

Another picture of the stair well progress from the laundry room side.

The window trim is completed.  Looks good.

This is a day or two later.  The flooring in the living room is installed.

The flooring in Cali's room is also done.

This is the progress on the stairs a few days later.  They are starting to construct the railing.

The floor in Alex's room is installed.

The late afternoon light was coming in through the glass block windows.  I thought it made a cool pattern on the wall.

The stairs from near the top.

The stairs from the top landing.