Sunday, May 20, 2012

May 19: Plumbing and eaves are going in and on.

The eaves in the front use tongue-in-groove boards.

The entrance has its eaves on too.

To save money, the eaves around the rest of the house were changed to plywood.

Plumbing for the half bath.

Looks like a sewer clean-out opening to the outside.

The laundry plumbing.

The main drain...

More main drain or stuff flowing too it.

The new south facing roof.  This is where the solar panels will be re-installed.  We're looking at the possibility to increase the size.


Matt and his crew.

The north facing roof.  Nothing but shingles go here.  Well, the skylights go here (a bit off to the right).

Yet another pic of the main room from the stairs area.  The horizontal section will be removed.  We've got enough wall to maintain contiguity.

Minor main drains flowing into the main drain.