Saturday, May 12, 2012

May 12: More roofing. A busy weekend. My niece got married, my daughter had high school swimming champion ships and other daughter had a softball tournament.

The front from the street (and behind the security fence).

The gable eaves are being added.

The eaves around the south side of the house.

The kitchen ceiling.  We're thinking we may leave the high slope instead of flat (at the level of the horizontal joist).

The new rear patio.  The right post is going to be moved 1/2 foot to the right.

The 'great' room.  The sofits are not yet in.

Some of the first bits of plumbing.  This is the main drain from the master bath.

The water heater room from the laundry room.  The diagonal thing is part of the contiguous 50% wall.

The mud room ceiling.  We need to figure out a solution for this.  It's 8', not 8.5' as the rest of the kitchen.

A pic of the detail of the main beam in the mud room.  It's part of the issue for how to deal with the mud room ceiling.

A pic of the front of the house from the other side.