Saturday, April 28, 2012

April 28: back porch needs some tweaks

The front entrance is taking shape.


Also adding the roof plywood.

The gable roof over Alex's room.

Looking down the stairwell.  The upper part is tricky and will need some special engineered wood.

From the new master bath looking into the walk-in closet.

The new master bath towards the shower.

The master bed room.  The window and door to the balcony are framed in.  You'll see those from the outside as being cut out.


Looking through the bathroom wall from the master bedroom.

Down the main hall. The roof is not yet on.

More roof work.

Saturday morning visit after swim practice.  This is in Alex's room.

The front entrance has more.  The gable roof is on.  The arch is really taken shape and the window above the arch is drawn in.

Same pic of the main hall as earlier, but now the roof plywood is on!

The new master bedroom window and door are now cut out.

Stairs from the laundry room.  You can see the tricky upper landing that's going to require the engineered wood.

More of the stairs...

The entry arch from the front door.  The window above the arch is drawn in.