Tuesday, April 24, 2012

April 24: More roof and second floor framing

Lot's of progress.  Got over late.  It's about 7:40pm.  The camera was on flash mode.  Anyway, here the roof plywood is going on.  The gables are being added 'California style' i.e. on top of the hip roof.  Odd, but it's normal practice.

The front left with it's own gable.

Cali in her new room.  The window is boarded up for protection.  The roof is on.  The ceiling joists are not yet in.

Cali again in her room.  The big beam is at the ceiling height.

The redone roof rafters in the kitchen.  The rectangle is for the new skylight.

From the back.  Doesn't look much different.

The driveway side.  More roof rafters.  That's about all.

Another view of the front looking into the living room.

Cali at the top of the stairs.  We need to use a short ladder to get to the second floor from the stair landing.

The view out the second floor window. Soon this will be blocked by the new roof.

Second floor framing.  This is the master bath looking towards the shower.

The old second floor bath had some water and bug damage. Not much though.

The master bedroom on the second floor. The window and door framing are shown. The door will lead to a balcony.

The roof above the girls bedrooms.  It might rain again tomorrow.