Saturday, September 15, 2012

Sept 15: lighting placement, plumbing placement, and more

It's been awhile since the last update.  We've been working on selecting the cabinetry and the stain color.  We've purchased the gas fireplace.  We've purchased fans for the baths.  We've purchased sinks.  We've selected switch placements.  Here are some pics.

A support column for the back porch.  This one follows the angle of the roof.

The same column from a different angle.  These will be covered with stucco.  Maybe some sort of stone at the bottom.

Trying to figure lighting for the piano.

Working out the plumbing placement in the girls bath.

Hmmm.. another piano placement pic.

Looks like me working the plumbing placement in the guest bath.

Beth working the plumbing placement in the master bath.

The girls tub is installed (covered with plywood to protect it).  The pocket doors are installed too.

This is the attic fan.  It should suck the hot air out of the attic.

That's Matt framing the fireplace.

Looks to be ready for installation!


The battery on the camera died.  There are more new things.  I'll do another update tomorrow.

No comments:

Post a Comment